Initiate GRN - Packages Tab
Step 1: Configure Location Inward Route
- Go to Back Office -> Settings -> Locations -> Edit Location
- Set Inward Route = Draft_Inspection
- Save the location
This ensures the system knows which locations require inspection before stock updates.
Step 2: Create GRN
- Open the GRN page
- Click Create GRN for incoming stock
Step 3: Initiate Goods Receive
- Select the assigned branch and location (location must have Draft_Inspection enabled)
- Click Initiate Goods Receive
- The Packages tab opens automatically
Packages Tab Actions:
- Approve received items
- Scan or type the received items
- Reject damaged or incorrect goods
- Adjust quantities (shortage/excess)
- Confirm stock before final posting
Only locations with Draft_Inspection route configured will display the Initiate Goods Receive button.
Step 4: Finalize GRN
- Save changes in Packages tab
- Click Finalize GRN to update stock automatically